Lebedinsky mining and processing plant. New tailings storage facility in Dubenka gully. Trunk slurry lines
21.01.2026
Lebedinsky mining and processing plant. Thickener discharge funnel M-4
20.01.2026
PU 3. Providing air balance for supply and exhaust ventilation in the main building of sylvite processing plant of PU 3. Trays
20.01.2026
Petrikovsky mining and processing plant. General site work. Pipelines
20.01.2026
PU 3. Reconstruction of the IV stage of de-sludging of sylvite processing plant with the installation of deep impeller foam separation machine
20.01.2026
Petrikovsky mining and processing plant. Comprehensive anti-corrosion protection
20.01.2026
Technical rearmament of SOF 4 RU. Reconstruction of the 3rd pair of clarification on line B, lining of the thickener type «Brandes» POS. B353/2 with a total area of 600 m2
30.03.2017
The selected material of corrosion Korotan HT
Saturated liquor tank V=169 m3 POS. 1CU1 in the Department RWCU SOF 4РУ JSC «Belaruskali»
30.03.2017
Corrosion protection of the tank is saturated liquor in RUKU SOF 4РУ JSC «Belaruskali»
06.03.2017
Characteristics of the working environment (saturated liquor)
Tubing pump salt slurry unloading thickeners «Brandes» in the solvent AND 351-2 SOF 4 RU, JSC «Belaruskali»
06.03.2017
The results of the control examination after 5280 hours
Hydrocyclone discharge pipeline 4 stages of desliming of the SOF thickening Department 1RU of Belaruskali»
06.03.2017
The pipeline transportation of uterine liquor SOF 4РУ JSC «Belaruskali»
06.03.2017
The pipeline transportation of uterine liquor SOF 4РУ JSC "Belaruskali".