Petrikovsky mining and processing plant. General site work. Pipelines

The company’s specialists manufactured and supplied:

— steel lined pipelines with lining material Polyglass, lining area more than 920 m2,
— fiberglass pipelines DN 900 and DN 1000 lined with Farbacoat Protect, lining area 220 m2,
— transportation trays of closed type and process trays lined with modified elasto-polyurethane, total lining area 984 m2.